Lake Lure Dam Replacement 2024 Replacement. $484,471 fema grant for the 30% design of the lake lure dam replacement. The 1927 lake lure dam is performing well but the dam does not meet modern safety standards.


Lake Lure Dam Replacement 2024 Replacement

The current dam, which does not meet modern safety standards, was built in 1927. One of the important projects that has been underway during the 2024 winter lake drawdown is the construction of the lake lure dam reservoir drain.

Lake Lure Dam Replacement 2024 Replacement Images References :